Discover the Manufacturing Waste, the Cost Justify removing it. ROCE +  

manufacturing cost factors


Up
MORE MANAGEMENT
Business Engineering
Maintenance Policies 2
Total Productive Maintenance PPT
Maintenance Reliability PowerPoints
EAM Systems PowerPoints
Planning & Scheduling Powerpoint
SOP development - 2
Process Risk Management
Engineering Project Management
System Engineering Reports
Business Report Writing
Project Management Reports
Accuracy Controlled Enterprise
Defect - Failure True Cost
True Downtime Cost Analysis 2
Operational Intg. Management
Work Order System
Total Quality Management
Emergency Power Plan
Facility Management
Maintenance Policy ...
Asset Management Toolkit
Writing SOP
Process Hazards Analysis
Process Safety Audit
Performance Based Safety
Fault Tree Analysis
Criticality Analysis
Lean Manufacturing
Maintenance Advisor
Key Performance Indicator
Maintenance Excellence
CMMS Advice
CMMS Selection Kit
CMMS Insider's Guide
Silver Reliability Training
Gold Reliability Training
In House Training
Maintenance Bible
Asset Management
Ebooks on CD
Maintenance Planning CD
SOP Training
Project Management Training
Inventory Control CBT

 

 

 

 

 

 

True Activity Based Costing for industry, with action plan! 

True Downtime Cost Analysis - 2nd Edition

By Don Fitchett and Mike Sondalini

The true cost of downtime reveals true cost of industry

Free book sample - Contents

True Downtime Cost Analysis - 2nd Edition
ESBN: F36-047B-2151-10B2
Description:  

The manufacturing cost categories in this Ebook are focused on the true cost of downtime utilizing Activity Based Costing (ABC) to identify and eliminate manufacturing waste. Authors Don Fitchett and Mike Sondalini coauthor the extension of the original book "The true cost of manufacturing downtime" (ISBN 1-933047-15-1). With this second edition also comes an action plan to utilize existing data sharing technology to monitor the many manufacturing cost categories.

'True Downtime Cost Analysis (TDC)' is the final piece to the lean manufacturing puzzle and a great cost justification tool for maintenance managers and production managers, right up to general managers, to make changes in their operations that move their companies toward using better practices.

The OEE - TEEP chapter discuss this benchmarking process tool from a return on capital employed (ROCE) point of view. In line with the "True" perspective of this book, the author clarifies the proper use of  OEE - TEEP. The action plan chapter ends with a detailed example plan followed by an additional example of implementing TDC in your facility to it's fullest extent.

"The TDC method used reveals many cost saving opportunities that would not be evident using standard labor and overheads cost tracking methodologies."

Extracts and summaries from this 102 page ebook have been published as industrial engineering articles in many engineering and management journals as well as industry websites throughout the world.

(Control Engineering, Instrumentation and Control Journal, Facilities Engineering Journal, Pumps & Systems Magazine, Pharma Manufacturing Magazine, Hong Kong Engineer, and more ...)

Email with download link sent immediately after purchase.

Price:  US$29.95 

Shop More

Automated download system is powered by our preferred method of payment, secure Pay Pal. (After purchase with 'Buy Now' button above, you immediately receive an email with download link.) If you prefer us to manually process your order or would like to mail or fax order in, please click CD and Book Order Form on our secure servers at BIN95.

(Click on Credit card picture above for manual order processing. Your download link will be emailed within 24 hours with manual processing.)

What is an 'Ebook'? - Why Buy Ebooks?

 

Industrial manufacturing services provider you can trust.

 


Table of Contents

  • Introduction to True Downtime Costs (TDC)
  • Getting Started with OEE and TDC.
    • Prioritize:
    • Analysis:
    • Set up OEE and TDC Plant-Wide
  • Overview Of The Metrics
    • Cost Factors Overview
  • A Closer Look at Equipment Categories
    • Cost
    • Data Collection
    • People
    • Product
    • Start-up
    • Bottleneck-Factor
    • Sales Expectation
  • A Closer Look at Labour Categories
    • Labor Per Product (LPP)
    • QC Labor
    • Maintenance Labor
    • Engineering Labour
    • Management Labor
    • Overhead
    • Manufacturing Cost
  • A Closer Look at Downtime Categories
    • Maintenance Time
    • Maintenance Reduced Production
    • Scrap Cost
    • Band-Aid
    • OEM, Outsourcing Service Contractor, Consultants
    • OEM Metrics
    • Machine Tooling Cost
    • Maintenance Parts and Shipping
  • Understanding Overall Equipment Effectiveness (OEE)
    • Benefits of Using Overall Equipment Efficiency
    • Benefits of Using True Downtime Cost
    • Setting OEE base lines (Goals)
    • The Right Way to Use Benchmarking
  • Total Effective Equipment Productivity (TEEP).
    • Where to start with TEEP?
  • Standards for Downtime Factors
    • Using TDC Metrics to Make Decisions
    • Use a Recognised, Open Data Sharing Standard
  • What is the True Downtime Cost (TDC)?
    • Hidden Costs Unearthed and Revealed With TDC
    • Looking For The Overlooked!
    • Equipment Cost Categories (Constants)
    • Labor Cost Categories (Constants)
    • Downtime Cost Categories (Occurrence)
  • Action Plan
    • Overview of the Action Plan
    • Steps along the Way
    • Implementing Automated Data Collection
    • Motivating Management
    • See True Savings Resulting From The Programs You  Implement
    • Motivating Employees
    • Utilising TDC in Daily Decisions
  • Resource Chapter
  • Frequently Asked Questions
  • Glossary
  • Appendix

Price:  US$29.95 

Shop More

Automated download system is powered by our preferred method of payment, secure Pay Pal. (After purchase with 'Buy Now' button above, you immediately receive an email with download link.) If you prefer us to manually process your order or would like to mail or fax order in, please click CD and Book Order Form on our secure servers at BIN95.

True Activity Based Costing for industry, with action plan! 

True Downtime Cost Analysis - 2nd Edition

By Don Fitchett and Mike Sondalini

The true cost of downtime reveals true cost of industry

Free book sample - Contents

True Downtime Cost Analysis - 2nd Edition
ESBN: F36-047B-2151-10B2
Description:  

The manufacturing cost categories in this Ebook are focused on the true cost of downtime utilizing Activity Based Costing (ABC) to identify and eliminate manufacturing waste. Authors Don Fitchett and Mike Sondalini coauthor the extension of the original book "The true cost of manufacturing downtime" (ISBN 1-933047-15-1). With this second edition also comes an action plan to utilize existing data sharing technology to monitor the many manufacturing cost categories.

'True Downtime Cost Analysis (TDC)' is the final piece to the lean manufacturing puzzle and a great cost justification tool for maintenance managers and production managers, right up to general managers, to make changes in their operations that move their companies toward using better practices.

The OEE - TEEP chapter discuss this benchmarking process tool from a return on capital employed (ROCE) point of view. In line with the "True" perspective of this book, the author clarifies the proper use of  OEE - TEEP. The action plan chapter ends with a detailed example plan followed by an additional example of implementing TDC in your facility to it's fullest extent.

"The TDC method used reveals many cost saving opportunities that would not be evident using standard labor and overheads cost tracking methodologies."

Extracts and summaries from this 102 page ebook have been published as industrial engineering articles in many engineering and management journals as well as industry websites throughout the world.

(Control Engineering, Instrumentation and Control Journal, Facilities Engineering Journal, Pumps & Systems Magazine, Pharma Manufacturing Magazine, Hong Kong Engineer, and more ...)

Email with download link sent immediately after purchase.

Price:  US$29.95 

Shop More

Automated download system is powered by our preferred method of payment, secure Pay Pal. (After purchase with 'Buy Now' button above, you immediately receive an email with download link.) If you prefer us to manually process your order or would like to mail or fax order in, please click CD and Book Order Form on our secure servers at BIN95.

(Click on Credit card picture above for manual order processing. Your download link will be emailed within 24 hours with manual processing.)

What is an 'Ebook'? - Why Buy Ebooks?

 

Industrial manufacturing services provider you can trust.

 


Table of Contents

  • Introduction to True Downtime Costs (TDC)
  • Getting Started with OEE and TDC.
    • Prioritize:
    • Analysis:
    • Set up OEE and TDC Plant-Wide
  • Overview Of The Metrics
    • Cost Factors Overview
  • A Closer Look at Equipment Categories
    • Cost
    • Data Collection
    • People
    • Product
    • Start-up
    • Bottleneck-Factor
    • Sales Expectation
  • A Closer Look at Labour Categories
    • Labor Per Product (LPP)
    • QC Labor
    • Maintenance Labor
    • Engineering Labour
    • Management Labor
    • Overhead
    • Manufacturing Cost
  • A Closer Look at Downtime Categories
    • Maintenance Time
    • Maintenance Reduced Production
    • Scrap Cost
    • Band-Aid
    • OEM, Outsourcing Service Contractor, Consultants
    • OEM Metrics
    • Machine Tooling Cost
    • Maintenance Parts and Shipping
  • Understanding Overall Equipment Effectiveness (OEE)
    • Benefits of Using Overall Equipment Efficiency
    • Benefits of Using True Downtime Cost
    • Setting OEE base lines (Goals)
    • The Right Way to Use Benchmarking
  • Total Effective Equipment Productivity (TEEP).
    • Where to start with TEEP?
  • Standards for Downtime Factors
    • Using TDC Metrics to Make Decisions
    • Use a Recognised, Open Data Sharing Standard
  • What is the True Downtime Cost (TDC)?
    • Hidden Costs Unearthed and Revealed With TDC
    • Looking For The Overlooked!
    • Equipment Cost Categories (Constants)
    • Labor Cost Categories (Constants)
    • Downtime Cost Categories (Occurrence)
  • Action Plan
    • Overview of the Action Plan
    • Steps along the Way
    • Implementing Automated Data Collection
    • Motivating Management
    • See True Savings Resulting From The Programs You  Implement
    • Motivating Employees
    • Utilising TDC in Daily Decisions
  • Resource Chapter
  • Frequently Asked Questions
  • Glossary
  • Appendix

Price:  US$29.95 

Shop More

Automated download system is powered by our preferred method of payment, secure Pay Pal. (After purchase with 'Buy Now' button above, you immediately receive an email with download link.) If you prefer us to manually process your order or would like to mail or fax order in, please click CD and Book Order Form on our secure servers at BIN95.

Up
MORE MANAGEMENT
Business Engineering
Maintenance Policies 2
Total Productive Maintenance PPT
Maintenance Reliability PowerPoints
EAM Systems PowerPoints
Planning & Scheduling Powerpoint
SOP development - 2
Process Risk Management
Engineering Project Management
System Engineering Reports
Business Report Writing
Project Management Reports
Accuracy Controlled Enterprise
Defect - Failure True Cost
True Downtime Cost Analysis 2
Operational Intg. Management
Work Order System
Total Quality Management
Emergency Power Plan
Facility Management
Maintenance Policy ...
Asset Management Toolkit
Writing SOP
Process Hazards Analysis
Process Safety Audit
Performance Based Safety
Fault Tree Analysis
Criticality Analysis
Lean Manufacturing
Maintenance Advisor
Key Performance Indicator
Maintenance Excellence
CMMS Advice
CMMS Selection Kit
CMMS Insider's Guide
Silver Reliability Training
Gold Reliability Training
In House Training
Maintenance Bible
Asset Management
Ebooks on CD
Maintenance Planning CD
SOP Training
Project Management Training
Inventory Control CBT

 

 

 

 

 

 

Viewers understands that any content or other information offered on or through FeedForward.com.au is provided for informational purposes only. Viewers should evaluate any content or other information offered on or through FeedForward.com.au in light of viewer's own individual circumstances. © 2016 Feed Forward - A subsidiary of Business Industrial Network